Violation Detail
Standard Cited: 19100303 B01 IV General.
Inspection Nr: 1313607.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/25/2018 2
Initial Penalty: $8,315.00
Current Penalty: $5,820.50
Issuance Date: 09/28/2018
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0728900
Contest Date:
Final Order: 10/11/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/11/2018 | $5,820.50 | 10/25/2018 | Serious | |
| Penalty | Z: Issued | 09/28/2018 | $8,315.00 | 10/25/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.303(b)(1)(iv): Electric equipment was not free from recognized hazards that were likely to cause serious physical harm to employees, such as damaged electrical insulation: The employer is exposing employees to an electrical shock hazard while using electrical powered tools in the finishing area. This was most recently observed at 802 Allied Road, Bellevue, Nebraska on May 3, 2018 when an electrical power cord was observed with damaged outer insulation. This cord was being used in an outdoor location and was exposed to wet weather conditions.