Violation Detail
Standard Cited: 19260950 D General.
This violation item has been deleted.
Inspection Nr: 1313169.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 10/26/2018
Initial Penalty: $9,239.00
Current Penalty: $0.00
Issuance Date: 10/22/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0111700
Contest Date:
Final Order: 11/14/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/14/2018 | $0.00 | 10/26/2018 | Serious | |
| Penalty | Z: Issued | 10/22/2018 | $9,239.00 | 10/26/2018 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.950(d)(1): Existing characteristics and conditions of electric lines and equipment that were related to the safety of the work to be performed were not determined before work on or near the lines or equipment was started including, but not limited to, the nominal voltages of lines and equipment: Site- Employees exposed to live overhead conductors operating at 34.5 kv while setting a 50 foot utility pole between live conductors were not informed of the nominal voltage of the overhead power lines by the employer.
Translate