Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1311546.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 07/03/2018 2
Initial Penalty: $9,239.00
Current Penalty: $5,543.40
Issuance Date: 05/16/2018
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 5
Report ID: 0729300
Contest Date:
Final Order: 06/12/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/12/2018 | $5,543.40 | 07/03/2018 | Serious | |
| Penalty | Z: Issued | 05/16/2018 | $9,239.00 | 07/03/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: The employer's annual lockout/tagout inspection did not include the energy control procedures for the NBE tote dumpers and conveyors for all operators. Abatement documentation is required for this violation.