Violation Detail
Standard Cited: 19260451 F06 General requirements.
This violation item has been deleted.
Inspection Nr: 1310553.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/25/2018 2
Initial Penalty: $5,174.00
Current Penalty: $0.00
Issuance Date: 10/10/2018
Nr Instances: 1
Nr Exposed: 12
Related Event Code (REC): A
Gravity: 10
Report ID: 0625700
Contest Date: 10/25/2018
Final Order: 09/28/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/28/2019 | $0.00 | 10/25/2018 | Serious | |
| Penalty | C: Contested | 10/25/2018 | $5,174.00 | 10/25/2018 | Serious | |
| Penalty | Z: Issued | 10/10/2018 | $5,174.00 | 10/25/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6). On or about April 19, 2018, in front of the Hampton Inn located at 2730 N. Causeway Blvd., New Orleans, LA; employees erecting metal tubular scaffolding were not protected from the scaffold and/or scaffold parts making contact with overhead live electrical powerlines. The scaffold became energized when a metal pole being handled by an employee made contact with the powerline creating electrical shock hazards.