Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1310126.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 06/13/2018 2
Initial Penalty: $12,934.00
Current Penalty: $7,000.00
Issuance Date: 05/15/2018
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0521400
Contest Date:
Final Order: 05/30/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/30/2018 | $7,000.00 | 06/13/2018 | Serious | |
| Penalty | Z: Issued | 05/15/2018 | $12,934.00 | 06/13/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On or about April 10, 2018, energy control procedure were not documented nor utilized for inspection and maintenance tasks on Rexroth TS-5 gearbox(es). Employees assigned to perform such tasks were exposed to caught-in hazards likely to cause amputation. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).