Violation Detail
Standard Cited: 19260754 A Structural steel assembly.
Inspection Nr: 1309717.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/05/2018 2
Initial Penalty: $3,880.00
Current Penalty: $3,880.00
Issuance Date: 09/11/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 10/03/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/03/2018 | $3,880.00 | 10/05/2018 | Serious | |
| Penalty | Z: Issued | 09/11/2018 | $3,880.00 | 10/05/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.754(a): Structural stability shall be maintained at all times during the erection process. On April 2, 2018 located at column line 7, between F7 and F5 while crane setting open web bar joist, a beam placed open bar joist an employee was standing on was not maintained in a structurally stable condition, in that incidental contact form the incoming bar joist caused accidental disengagement of the unsecured bar joist from its location of placement on the beam.
Translate