Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1307515.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 06/06/2018 2
Initial Penalty: $9,977.00
Current Penalty: $6,983.90
Issuance Date: 05/10/2018
Nr Instances: 1
Nr Exposed: 13
Related Event Code (REC): R
Gravity: 5
Report ID: 0336000
Contest Date:
Final Order: 05/16/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/16/2018 | $6,983.90 | 06/06/2018 | Serious | |
| Penalty | Z: Issued | 05/10/2018 | $9,977.00 | 06/06/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(d): The established procedures for the application of energy control (the lockout or tagout procedures) were not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): a) International Timber & Veneer, maintenance chipper room. On or about April 10, 2018, and times prior thereto, employees performing servicing and maintenance, including, but not limited to cleaning and clearing jams from the maintenance chipper, did not follow the energy control procedures before having hands near the moving parts of the chipper.