Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1304506.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/27/2018 2
Initial Penalty: $5,174.00
Current Penalty: $3,000.00
Issuance Date: 06/01/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 06/22/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/22/2018 | $3,000.00 | 06/27/2018 | Serious | |
| Penalty | Z: Issued | 06/01/2018 | $5,174.00 | 06/27/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(3): Before work began the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring a person, tool, or machine into physical or electrical contact with the energized electric power circuit: On or about March 23, 2018, in building 1 of the facility located 1701 W. Marshall Drive, Grand Prairie, Texas, where the employer did not ensure that all circuits were de-energized prior to the start of work.