Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1302939.015
Citation: 01001A
Citation Type: Other
Abatement Date: 10/11/2018 2
Initial Penalty: $12,934.00
Current Penalty: $9,054.00
Issuance Date: 08/23/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0626700
Contest Date:
Final Order: 09/21/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/21/2018 | $9,054.00 | 10/11/2018 | Other | |
| Penalty | Z: Issued | 08/23/2018 | $12,934.00 | 10/11/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for securing machines or equipment to control hazardous energy: a) Dow Bayport: On March 15, 2018, the employer's energy control procedures did not clearly and specifically outline steps for One-Plus to prevent the inadvertent operation of the suction valve, discharge valve and pump breaker of pump P173 for the sulfuric piping system.
Translate