Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1299752.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $8,980.00
Current Penalty: $5,388.00
Issuance Date: 05/01/2018
Nr Instances: 3
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0625700
Contest Date:
Final Order: 05/10/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/10/2018 | $5,388.00 | Serious | ||
Penalty | Z: Issued | 05/01/2018 | $8,980.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about 3/6/18 in the Machine Shop; the employer allowed employees to operate the Amada Hydraulic Press Brake, the 367 VC Punch Press (model Apel10 III), and the Ellis Mitre Band Saw (model 1600), and the Adria Hydraulic Press, and the employer did not conduct a periodic inspection of the energy control procedure at least annually.