Violation Detail
Standard Cited:19100036 G02 Design and construction requirements for exit routes.
Violation Items |
|
Nr: 1292926.015 |
Citation: 01001A |
Issuance: 06/28/2018 |
ReportingID: 0418800 |
|
|
Viol Type: | Serious |
NrInstances: | 1 |
Contest Date: | 07/24/2018 |
Abatement Date: | 07/13/2018 2 |
Nr Exposed: | 4 |
Final Order: | 09/28/2018 |
Initial Penalty: | $6,468.00 |
REC: | |
Emphasis: | |
Current Penalty: | $3,234.00 |
Gravity: | 5 |
Haz Category: | |
Penalty and Failure to Abate Event History |
Type |
Event |
Date |
Penalty |
Abatement |
Type |
FTA Insp |
Penalty |
Z: Issued |
06/28/2018 |
$6,468.00 |
07/13/2018 |
Serious |
|
Penalty |
C: Contested |
07/31/2018 |
$6,468.00 |
07/13/2018 |
Serious |
|
Penalty |
J: ALJ Decision |
09/28/2018 |
$3,234.00 |
07/13/2018 |
Serious |
|