Violation Detail
Standard Cited: 19100303 B01 II General.
Inspection Nr: 1289588.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $7,391.00
Current Penalty: $7,391.00
Issuance Date: 07/18/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0729700
Contest Date:
Final Order: 08/09/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 07/18/2018 | $7,391.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.303(b)(1)(ii): Electrical equipment was not free from recognized hazards, based on the mechanical strength and durability, including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus provided: Employees working near the stone saw in the saw department were exposed to electrical shock hazards in that the conduit containing the electrical supply to the east saw motor was broken and not maintained.
Translate