Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1289445.015
Citation: 01001
Citation Type: Serious
Abatement Date: 05/29/2018 2
Initial Penalty: $11,641.00
Current Penalty: $6,800.00
Issuance Date: 05/22/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 10
Report ID: 0215000
Contest Date: 08/20/2018
Final Order: 11/28/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 11/28/2018 | $6,800.00 | 05/29/2018 | Serious | |
| Penalty | C: Contested | 08/20/2018 | $11,641.00 | 05/29/2018 | Serious | |
| Penalty | Z: Issued | 05/22/2018 | $11,641.00 | 05/29/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) West building 29th floor men's room: On or about January 23, 2018 The electrical power circuit was not de-energized and he did not use any other protective means when he came into contact energized parts.
Translate