Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1279986.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/30/2018 2
Initial Penalty: $3,696.00
Current Penalty: $1,848.00
Issuance Date: 04/18/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A;R
Gravity: 5
Report ID: 0112600
Contest Date:
Final Order: 05/10/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/10/2018 | $1,848.00 | 04/30/2018 | Serious | |
| Penalty | Z: Issued | 04/18/2018 | $3,696.00 | 04/30/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: (a) Site: In the production area at the door adjacent to fire extinguisher station #4, 42 Wilcox Street, Springfield, MA 01105, on 11/30.2017 the exit door/discharge was locked.