Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1277959.015
Citation: 01007B
Citation Type: Serious
Abatement Date: 06/20/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/03/2018
Nr Instances: 4
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0626600
Contest Date:
Final Order: 05/22/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/22/2018 | $0.00 | 06/20/2018 | Serious | |
Penalty | Z: Issued | 05/03/2018 | $0.00 | 05/22/2018 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.147(c)(4)(i): Energy control procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. On or about November 16, 2017, at the Double R Brand Foods facility located in Lufkin Texas, the employer did not develop energy control procedures for equipment, including but not limited to: a) Water pump for Evaporative Condenser #1 (EC1), b) Re-circulate pump AP-1 for recirculate vessel V1, c) Pump AP-8 Re-circulation/intercooler for V4, d) Fan motor for Evaporative Condenser #4 (EC4).