Violation Detail
Standard Cited: 19100217 C03 IV D Mechanical power presses.
Inspection Nr: 1273306.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $11,086.00
Current Penalty: $7,200.00
Issuance Date: 01/08/2018
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 5
Report ID: 0213600
Contest Date:
Final Order: 01/24/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/24/2018 | $7,200.00 | Serious | ||
| Penalty | Z: Issued | 01/08/2018 | $11,086.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.217(c)(3)(iv)(d): Employer did not use a control system and a brake monitor which complied with paragraphs (b) (13) and (14) of this section: a) On or before 09/25/17 in the Stamping department; employees were using their hands to place and remove parts from the point of operation on Press 0255 ( 45 ton Minister mechanical power press) and exposed to a crushing injury hazard when the press was not equipped with a control system or brake monitor. b) On or before 09/25/17 in the Stamping department; employees were using their hands to place and remove parts from point of operation on the Press 202318 ( 60 ton Minister mechanical power press ) and exposed to a crushing injury hazard when the press was not equipped with a control system or brake monitor. NO ABATEMENT CERTIFICATION REQUIRED
Translate