Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1273242.015
Citation: 01002
Citation Type: Serious
Abatement Date: 05/25/2018 2
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 04/10/2018
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 05/07/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/07/2018 | $12,934.00 | 05/25/2018 | Serious | |
| Penalty | Z: Issued | 04/10/2018 | $12,934.00 | 05/25/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the equipment were not physically located and operated in such a manner as to isolate the machine equipment from the energy source: (a) On or about October 18th 2017, in the C-line unit at the Braskem facility located in La Porte Texas; the employer failed to ensure that the isolating devices needed to control the hazardous energy for the high pressure bag filter (F-300-C) were applied in a manner so as to isolate the equipment from the steam trace. This condition exposed employees to high temperature water hazards.
Translate