Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1272282.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/12/2018 2
Initial Penalty: $3,696.00
Current Penalty: $2,587.20
Issuance Date: 02/26/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 5
Report ID: 0317700
Contest Date:
Final Order: 03/14/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/14/2018 | $2,587.20 | 04/12/2018 | Serious | |
| Penalty | Z: Issued | 02/26/2018 | $3,696.00 | 04/12/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures: a) Dallas, PA: The lockout procedure for the APV 2080 extruder did not include steps necessary to test the machine in order to verify the effectiveness of lockout, on or about October 24, 2017. ABATEMENT CERTIFICATION REQUIRED