Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1272033.015
Citation: 01002
Citation Type: Other
Abatement Date: 04/10/2018 2
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 03/22/2018
Nr Instances: 1
Nr Exposed: 319
Related Event Code (REC): R
Gravity:
Report ID: 0215000
Contest Date: 04/11/2018
Final Order: 07/17/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 07/17/2018 | $12,934.00 | 04/10/2018 | Other | |
| Penalty | C: Contested | 06/12/2018 | $12,934.00 | 04/10/2018 | Serious | |
| Penalty | Z: Issued | 03/22/2018 | $12,934.00 | 04/10/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Entire facility: The employer did not conduct a periodic inspection of the energy control procedure at least annually for all machines and machine operators in the facility, to ensure that the procedure and the requirement of this standard were being followed by affected employees. On or about 10/17/17.