Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1270543.015
Citation: 01002
Citation Type: Serious
Abatement Date: 12/29/2017 2
Initial Penalty: $12,675.00
Current Penalty: $7,605.00
Issuance Date: 11/01/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 11/21/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/21/2017 | $7,605.00 | 12/29/2017 | Serious | |
| Penalty | Z: Issued | 11/01/2017 | $12,675.00 | 11/28/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d)(2): The machine or equipment was not turned off or shut down using the procedures established for the machine or equipment: a) Reynolds & Reynolds Co. on or about October 6, 2017 at the address of 412 Schunck Rd. Celina, OH: The employer did not ensure that energy isolating procedures for shutdown were performed prior to performing cleaning tasks on the Rotary Printing Press #462. Employees performing these task in energized condition were exposed to amputation hazards at or near the machines point of operation (between roller nip-points), in that energy control shutdown procedures required under 29 CRF 1910.147(d)(2) were not utilized before the employee began the aforementioned work task on the machine.