Violation Detail
Standard Cited: 19261412 D01 I
Inspection Nr: 1269584.015
Citation: 01001B
Citation Type: Other
Abatement Date: 03/23/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/27/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity:
Report ID: 0418800
Contest Date:
Final Order: 03/26/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/26/2018 | $0.00 | 03/23/2018 | Other | |
| Penalty | Z: Issued | 02/27/2018 | $0.00 | 03/23/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.1412(d)(1)(i): Control mechanisms were not checked for maladjustments which would interfere with proper operation each shift: On or about 10/11/2017, at the above addressed work site, the employer did not ensure a competent person conducted daily inspections that included checking the control mechanisms for the boom not to exceed its swing radius when outriggers are not fully extended. PLEASE NOTE: DOCUMENTATION AND CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION.
Translate