Violation Detail
Standard Cited: 19260451 F12 General requirements.
Inspection Nr: 1262565.015
Citation: 01003
Citation Type: Serious
Abatement Date: 01/19/2018 2
Initial Penalty: $5,070.00
Current Penalty: $3,550.00
Issuance Date: 12/21/2017
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC): A
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 01/09/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/09/2018 | $3,550.00 | 01/19/2018 | Serious | |
| Penalty | Z: Issued | 12/21/2017 | $5,070.00 | 01/19/2018 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(f)(12): Work on or from scaffolds is prohibited during storms or high winds unless a competent person has determined that it is safe for employees to be on the scaffold and those employees are protected by a personal fall arrest system or wind screens. Wind screens shall not be used unless the scaffold is secured against the anticipated wind forces imposed. (a) Commercial construction site, employees were performing masonry operations on a 25-feet high tubular welded scaffold when wind screens were used and when the scaffold was not secured against the anticipated wind forces imposed. Employees were exposed to scaffold collapse hazards.