Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1258663.015
Citation: 02001
Citation Type: Other
Abatement Date: 03/05/2018 2
Initial Penalty: $9,239.00
Current Penalty: $0.00
Issuance Date: 02/13/2018
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): R
Gravity:
Report ID: 0317700
Contest Date:
Final Order: 03/12/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/12/2018 | $0.00 | 03/05/2018 | Other | |
| Penalty | Z: Issued | 02/13/2018 | $9,239.00 | 03/05/2018 | Serious |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedure did not clearly and specifically address procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: a) Department 1103, 1 Second Street, Kreamer, PA - The lock-out/tag-out procedure for the Weinig Powermat 1000 (Company Name A1-514) did not address the need to de-energize the residual kinetic energy of the machine's rotating cutting heads when employees cleared jams thereby exposing employees to caught-in and struck by-hazards that could result in an amputation, on or about August 18, 2017. In accordance with 1903.19, abatement certification is required for this violation.