Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1255967.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/12/2018 2
Initial Penalty: $5,174.00
Current Penalty: $3,621.80
Issuance Date: 02/13/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0336000
Contest Date:
Final Order: 02/20/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/20/2018 | $3,621.80 | 03/12/2018 | Serious | |
| Penalty | Z: Issued | 02/13/2018 | $5,174.00 | 03/12/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Lakeview Forge Company, LLC. On or about August 16, 2017, and times prior thereto, employees performed servicing and maintenance work on machines that included but were not limited mechanical power presses. Specific energy control procedures had not been developed for employees to utilize when performing servicing and maintenance on machines such as, but not limited to, the mechanical power presses.