Violation Detail
Standard Cited: 19260025 A Housekeeping.
Inspection Nr: 1254092.015
Citation: 01001
Citation Type: Serious
Abatement Date: 01/31/2018 2
Initial Penalty: $3,326.00
Current Penalty: $2,000.00
Issuance Date: 01/19/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0215000
Contest Date:
Final Order: 04/12/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/12/2018 | $2,000.00 | 01/31/2018 | Serious | |
| Penalty | Z: Issued | 01/19/2018 | $3,326.00 | 01/31/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, was not kept cleared from work areas, passageways, and stairs, in and around buildings and other structures: Location: 195 Sullivan Place, Brooklyn, NY. a) Accumulated construction debris and materials on the ground were causing tripping hazards to employees. Employees fell on debris and materials. On or about 08/10/2017.
Translate