Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1250184.015
Citation: 01002B
Citation Type: Other
Abatement Date: 10/26/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/20/2017
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0830600
Contest Date:
Final Order: 11/02/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/02/2017 | $0.00 | 10/26/2017 | Other | |
| Penalty | Z: Issued | 10/20/2017 | $0.00 | 10/26/2017 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: a) On or about July 27, 2017 and at times prior, Quest Masonry, Inc., as the creating and correcting employer, did not ensure that guardrail systems were installed along all open sides of the platform. A foreman of Quest Masonry, Inc. and workers of Funez Stucco LLC were working on the fifth level of the scaffold and were exposed to fall hazards of approximately 40 feet.