Violation Detail
Standard Cited: 19260251 A06 Rigging equipment for material handling.
This violation item has been deleted.
Inspection Nr: 1249934.015
Citation: 02001
Citation Type: Other
Abatement Date: 01/22/2018
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/20/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0521100
Contest Date:
Final Order: 01/17/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/17/2018 | $0.00 | 01/22/2018 | Other | |
| Penalty | Z: Issued | 12/20/2017 | $0.00 | 01/22/2018 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.251(a)(6): "Inspections." Each day before being used, the sling and all fastenings and attachments shall be inspected for damage or defects by a competent person designated by the employer. Additional inspections shall be performed during sling use, where service conditions warrant. Damaged or defective slings shall be immediately removed from service. On or about July 26, 2017 at the Oneida Street bridge jobsite; a Rockford Nylon Web Sling (S/N: 3714_6-38) had two deep cuts/frays and a smashed section in the sling. The sling was not taken out of service, but just placed in the job box available for use.
Translate