Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1248169.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $8,873.00
Current Penalty: $8,873.00
Issuance Date: 11/21/2017
Nr Instances: 10
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 12/19/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/19/2017 | $8,873.00 | Serious | ||
| Penalty | Z: Issued | 11/21/2017 | $8,873.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29CFR 1910.147(c)(4)(ii)[A], 29CFR 1910.147(c)(4)(ii)[B], 29CFR 1910.147(c)(4)(ii)[C], and 29CFR 1910.147(c)(4)(ii)[D]: On or about 7/19/2017 in the production area at 2250 Atlanta Highway, Gainesville, GA: Where employees performed maintenance and or service on equipment such as but not limited to open lathes and Computer numerical control (CNC) lathe equipment, did not have clear and specific written energy control procedures.
Translate