Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1240207.015
Citation: 01002C
Citation Type: Serious
Abatement Date: 10/26/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/29/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0830300
Contest Date:
Final Order: 10/23/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/23/2017 | $0.00 | 10/26/2017 | Serious | |
| Penalty | Z: Issued | 09/29/2017 | $0.00 | 10/26/2017 | Serious |
Text For Citation: 01 Item/Group: 002C Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): (a) On or about June 7, for the employees exposed to fire hazards and injection hazards from methyl ethyl ketone where a Graco Contractor paint spray gun with a Graco Xtreme spraying pump unit were not de-pressurized prior to performing maintenance activities outside of the paint room 2420 First Avenue North Fargo, ND.