Violation Detail
Standard Cited: 19260753 D02 I Hoisting and rigging.
Inspection Nr: 1237894.015
Citation: 01001
Citation Type: Other
Abatement Date: 09/25/2017 2
Initial Penalty: $9,959.00
Current Penalty: $8,054.00
Issuance Date: 09/06/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity:
Report ID: 0626600
Contest Date:
Final Order: 10/03/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/03/2017 | $8,054.00 | 09/25/2017 | Other | |
| Penalty | Z: Issued | 09/06/2017 | $9,959.00 | 09/25/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.753(d)(2)(i): Materials being hoisted shall be rigged to prevent unintentional displacement; On or about June 2, 2017, at the worksite at o near 15842 Miller Road 1, the operator didn't ensure that the hoisted material was rigged to prevent unintentional displacement.