Violation Detail
Standard Cited: 19100169 B03 IV Air receivers.
Inspection Nr: 1236385.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $5,070.00
Current Penalty: $3,500.00
Issuance Date: 11/14/2017
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): R
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order: 12/06/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/06/2017 | $3,500.00 | Serious | ||
| Penalty | Z: Issued | 11/14/2017 | $5,070.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.169(b)(3)(iv): Safety valve(s) on compressed air receiver(s) were not tested at frequently regular intervals to determine if they were in good operating condition: a. On the compressor air tank mounted in the GMC service truck, a pressure relief valve was not tested frequently and at regular intervals. Abatement documentation is required for this violation.
Translate