Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1235482.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/30/2017 2
Initial Penalty: $3,803.00
Current Penalty: $2,200.00
Issuance Date: 09/14/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 10
Report ID: 0213600
Contest Date:
Final Order: 10/06/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/06/2017 | $2,200.00 | 10/30/2017 | Serious | |
| Penalty | Z: Issued | 09/14/2017 | $3,803.00 | 10/06/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) On or about 06/08/2017 throughout establishment; where employees perform servicing and maintenance operations such as, but not limited to: die changing and clearing of jams on mechanical power presses. ABATEMENT DOCUMENTATION REQUIRED
Translate