Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1234425.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/10/2017 2
Initial Penalty: $7,243.00
Current Penalty: $5,432.25
Issuance Date: 06/13/2017
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC):
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 07/07/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/07/2017 | $5,432.25 | 07/10/2017 | Serious | |
| Penalty | Z: Issued | 06/13/2017 | $7,243.00 | 07/10/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by moving saw blades: (a) Line 2 and Other Lines - Employees used Marel AEW Delford 400 vertical band saws to cut pigs' feet, and the employees did not adjust the blade guards down to the height of the meat, exposing employees to the hazard of getting cut by the unused portion of the band saw blades above the height of the meat, on or about May 9, 2017. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Translate