Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1233289.015
Citation: 01001D
Citation Type: Serious
Abatement Date: 09/29/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/19/2017
Nr Instances: 1
Nr Exposed: 76
Related Event Code (REC):
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 08/07/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/07/2017 | $0.00 | 09/29/2017 | Serious | |
| Penalty | Z: Issued | 07/19/2017 | $0.00 | 09/05/2017 | Serious |
Text For Citation: 01 Item/Group: 001D Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: 19 Depot St, Sutton, MA On July 5, 2017 at the closing of the inspection, the employer had only performed an accuracy review of each energy control procedure. The annual inspection did not meet two requirements of this standard: 1) did not inspect each procedure for inaccuracies during an actual energy control maintenance or servicing task 2) did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure.