Violation Detail
Standard Cited: 19100179 H04 Overhead and gantry cranes.
Inspection Nr: 1232814.015
Citation: 02001
Citation Type: Other
Abatement Date: 10/13/2017 2
Initial Penalty: $1,006.00
Current Penalty: $500.00
Issuance Date: 09/21/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0627500
Contest Date:
Final Order: 10/17/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/17/2017 | $500.00 | 10/13/2017 | Other | |
| Penalty | Z: Issued | 09/21/2017 | $1,006.00 | 09/27/2017 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.179(h)(4): Hooks did not meet the manufacturer's recommendations: On or about May 16, 2017, HEI beam molding yard; employees operating the 1 ton Jet hoist, used in pre-stressing cable operations was not being used in accordance with manufacture's specifications and limitations applicable to the operation, in that the latch for the hook had been removed. This condition exposed the employees to struck-by hazards.