Violation Detail
Standard Cited: 19260062 D01 I Lead
Inspection Nr: 1229110.015
Citation: 01002A
Citation Type: Other
Abatement Date: 09/13/2017 2
Initial Penalty: $7,243.00
Current Penalty: $7,243.00
Issuance Date: 08/09/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0316700
Contest Date: 08/30/2017
Final Order: 12/08/2017
Emphasis:
Substance: 1591
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/08/2017 | $7,243.00 | 09/13/2017 | Other | |
| Penalty | C: Contested | 08/31/2017 | $7,243.00 | 09/13/2017 | Serious | |
| Penalty | Z: Issued | 08/09/2017 | $7,243.00 | 09/13/2017 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.62(d)(1)(i): Each employer who had a workplace or operation covered by 29 CFR 1926.62 did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 ug/m3) calculated as an 8-hour time-weighted average (TWA): (a) Power Component Systems, Incorporated - 5455 Carlisle Pike Navy Bldg 307 Mechanicsburg PA - The employer did not conduct an initial determination of the employees' lead exposure for the employees using a reciprocating saw to cut the lead containing housing while dismantling the furnace, on or about April 27, 2017. Abatement certification required within 10 days after abatement. The certification shall include statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.