Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1228717.015
Citation: 02002
Citation Type: Other
Abatement Date: 07/11/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/16/2017
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC):
Gravity:
Report ID: 0213600
Contest Date: 06/19/2017
Final Order: 11/01/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 11/01/2017 | $0.00 | 07/11/2017 | Other | |
| Penalty | C: Contested | 06/22/2017 | $0.00 | 07/11/2017 | Other | |
| Penalty | Z: Issued | 06/16/2017 | $0.00 | 07/11/2017 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: a) On or about 05/01/2017 throughout establishment; where employees perform servicing and/or maintenance such as, but not limited to: setting up and repairing machines and equipment, the employer had not performed a periodic review (at least annually). ABATEMENT CERTIFICATION REQUIRED