Violation Detail
Standard Cited: 19260453 B02 VI Aerial lifts.
This violation item has been deleted.
Inspection Nr: 1228261.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/05/2017
Initial Penalty: $8,963.00
Current Penalty: $0.00
Issuance Date: 06/27/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 07/21/2017
Final Order: 11/08/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 11/08/2018 | $0.00 | 07/05/2017 | Serious | |
| Penalty | C: Contested | 07/26/2017 | $8,963.00 | 07/05/2017 | Serious | |
| Penalty | Z: Issued | 06/27/2017 | $8,963.00 | 07/05/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.453(b)(2)(vi): Boom and basket load limits specified by the manufacturer were exceeded: a) Route 7 bridge over Norfolk Southern Railroad, on or about 4-18-17: Employees were using an articulating, extensible boom aerial lift that was overloaded beyond the manufacturer's load limit. ABATEMENT CERTIFICATION I SREQUIRED FOR THIS ITEM
Translate