Violation Detail
Standard Cited: 19260652 B03 III Requirements for protective systems.
Inspection Nr: 1226593.015
Citation: 01001
Citation Type: Other
Abatement Date: 09/25/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/19/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0523400
Contest Date:
Final Order: 10/13/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/19/2017 | $0.00 | 09/25/2017 | Other |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.652(b)(3)(iii): Tabulated data, identifying the registered professional engineer who approved the data, was not maintained at the jobsite during construction of the protective system. After that time, that data was not made available to the Secretary when requested. (a) The employer did not ensure that tabulated data for a Pro-Tec Equipment brand hydraulic shoring was maintained on site. Additionally, the employer did not ensure that this tabulated data was submitted when requested.