Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1224244.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 06/02/2017 2
Initial Penalty: $9,234.00
Current Penalty: $5,500.00
Issuance Date: 04/17/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 1032500
Contest Date:
Final Order: 05/22/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/22/2017 | $5,500.00 | 06/02/2017 | Serious | |
| Penalty | Z: Issued | 04/17/2017 | $9,234.00 | 06/02/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): Energy control procedures did not clearly and specifically outline procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. a) On or about April 6, 2016 or prior thereto: The energy control program of Patrick Industries dba Decor did not outline specific steps to isolate and secure the Voorwood Laminator Glue Rollers prior to machine maintenance. NOTE: Abatement certification is required for this item.
Translate