Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1221284.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 02/26/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/11/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 5
Report ID: 0213100
Contest Date: 06/05/2017
Final Order: 02/16/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 02/16/2018 | $0.00 | 02/26/2018 | Serious | |
| Penalty | C: Contested | 06/08/2017 | $0.00 | 05/17/2017 | Serious | |
| Penalty | Z: Issued | 05/11/2017 | $0.00 | 05/17/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: a) On the first floor of the operating plant - On March 30, 2017, the baler was not locked out and tagged out prior to being serviced by an employee while the machine was operating.