Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1219798.015
Citation: 01002
Citation Type: Serious
Abatement Date: 05/31/2017 2
Initial Penalty: $4,617.00
Current Penalty: $3,231.90
Issuance Date: 05/04/2017
Nr Instances: 2
Nr Exposed: 5
Related Event Code (REC): R
Gravity: 1
Report ID: 0418100
Contest Date:
Final Order: 05/24/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/24/2017 | $3,231.90 | 05/31/2017 | Serious | |
| Penalty | Z: Issued | 05/04/2017 | $4,617.00 | 05/31/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control a. 2300 Miller Road, Decatur, GA (Throughout Shop) - Employees were exposed to sudden energization or start-up of multi-energy source. The company's lockout/tagout machine specific procedures did not include specific requirements for testing the machines or equipment to determine and verify the effectiveness of lockout devices, tagout devices and other energy control measures were not included in the specific procedures for the following machines and equipment, on or about 03/24/17. a. Air Compressors and Refrigerated Dryers b. Compactors c. Corrugate Balers d. Conveyor System and GOH Jervis Web e. Diesel Fire Pump f. Dock Levelers g. Chillers, Cooling Tower and Associated Equipment h. Intelligrated Slat Shoe Sorter i. Store Trays, Rapid Pack Blue Tray Drive j. Boilers and Associated Pump k. Standby Generator l. Fire Suppression System m. Electrical Control Panels n. Caljan Conveyor