Standard Cited: 19100107 D03 Spray finishing using flammable and combustible materials.

Inspection Nr: 1219419.015

Citation: 01002F

Citation Type: Other

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 07/28/2017

Nr Instances: 1

Nr Exposed: 10

Abatement Date: 03/19/2018

Gravity:

Report ID: 0523400

Contest Date: 08/22/2017

Final Order: 01/18/2018

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 01/18/2018 $0.00 03/19/2018 Other  
Penalty C: Contested 08/30/2017 $0.00 08/09/2017 Serious  
Penalty Z: Issued 07/28/2017 $0.00 08/09/2017 Serious  

Text For Citation: 01 Item/Group: 002F Hazard:

29 CFR 1910.107(d)(3): Each spray booth did not have an independent exhaust duct system discharging to the exterior of the building, except that multiple cabinet spray booths in which identical spray finishing material is used with a combined frontal area of not more than 18 square feet may have a common exhaust: (a) The paint booth shared an exhaust duct with the adjacent soldering bench.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.