Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1217534.015
Citation: 02002
Citation Type: Other
Abatement Date: 08/18/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/25/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0729700
Contest Date:
Final Order: 08/15/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/15/2017 | $0.00 | 08/18/2017 | Other | |
| Penalty | Z: Issued | 07/25/2017 | $0.00 | 08/18/2017 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: A periodic inspection of the energy control procedures for equipment such as the Line 3, convoluted press were not conducted at least annually.