Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1216738.015
Citation: 01001
Citation Type: Other
Abatement Date: 08/02/2017 2
Initial Penalty: $9,054.00
Current Penalty: $5,000.00
Issuance Date: 07/14/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0521700
Contest Date:
Final Order: 08/01/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/01/2017 | $5,000.00 | 08/02/2017 | Other | |
| Penalty | Z: Issued | 07/14/2017 | $9,054.00 | 08/02/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. Plant area Line #4 - On or about March 13, 2017, in the facility, authorized employees were required to perform maintenance and/or service on various machinery including, but not limited to, Chicago slitter, Bushman coil tipper, and Sullinar air compressor. The employer did not conduct periodic inspections of the energy control procedures at least annually to assure that the procedures and requirements of the standard were being followed.