Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1215387.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 04/12/2017 2
Initial Penalty: $5,387.00
Current Penalty: $2,693.50
Issuance Date: 03/17/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 5
Report ID: 0729300
Contest Date:
Final Order: 03/29/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/29/2017 | $2,693.50 | 04/12/2017 | Serious | |
| Penalty | Z: Issued | 03/17/2017 | $5,387.00 | 04/12/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to Items of this section: Lockout procedures were not developed for the global mattic machine. (Note: the machine was powered by electric and air energy.) Abatement documentation is required for this violation.