Violation Detail
Standard Cited: 19100147 D04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1214252.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/03/2017
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 08/22/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/22/2017 | $0.00 | Serious | ||
Penalty | Z: Issued | 08/03/2017 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(d)(4)(ii): Lockout devices utilized were not affixed in a manner that held the energy isolating device in a safe or off position. (a)The Teledyne Pines bender was not properly locked out while conducting maintenance on the bending arm of the machine. A padlock was not attached to the lockout hasp and safety tag that make up the energy isolating device needed to to isolate the energy to the machine.