Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1210120.015
Citation: 01002
Citation Type: Serious
Abatement Date: 08/20/2018 2
Initial Penalty: $12,675.00
Current Penalty: $12,675.00
Issuance Date: 08/04/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 10
Report ID: 0317300
Contest Date: 08/28/2017
Final Order: 07/19/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/19/2018 | $12,675.00 | 08/20/2018 | Serious | |
Penalty | C: Contested | 08/30/2017 | $12,675.00 | 08/23/2017 | Serious | |
Penalty | Z: Issued | 08/04/2017 | $12,675.00 | 08/23/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to items of this section: a) Debone Area - On or about February 9, 201,7 the employer failed to provide clear procedures to be followed during servicing and maintenance of energized machinery and equipment. Developed procedures did not clearly inform employees of the techniques or steps to be followed while engaged in cleaning and sanitation of the Race Track Conveyor (Intralox) while in operation.