Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1209694.015
Citation: 01001B
Citation Type: Other
Abatement Date: 04/12/2017 2
Initial Penalty: $6,519.00
Current Penalty: $0.00
Issuance Date: 02/24/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0729300
Contest Date: 03/07/2017
Final Order: 04/09/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 04/09/2018 | $0.00 | 04/12/2017 | Other | |
| Penalty | C: Contested | 03/14/2017 | $6,519.00 | 04/12/2017 | Serious | |
| Penalty | Z: Issued | 02/24/2017 | $6,519.00 | 04/12/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: On 02/09/2017, an employee, working for Niehaus Building Services LLC at the Mercy Hospital addition, 1400 Hwy 61 South, Crystal City, MO, was required to work from a tubular welded frame scaffold with an inadequate inspection or no inspection by a competent scaffold person. The working level of this scaffold was only decked at approximately 67%, the decking was coated with a wet fireproofing spray material, and questionable safe access due to set-up arrangement and conditions.