Violation Detail
Standard Cited: 19260752 B Site layout, site-specific erection plan and construction sequence.
This violation item has been deleted.
Inspection Nr: 1207400.015
Citation: 01001
Citation Type: Other
Abatement Date: 06/23/2017
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/01/2017
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC):
Gravity:
Report ID: 0419400
Contest Date:
Final Order: 06/22/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/22/2017 | $0.00 | 06/23/2017 | Other | |
| Penalty | Z: Issued | 06/01/2017 | $0.00 | 06/23/2017 | Other |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.752(b): The steel erection contractor began steel erection work without written notification that the concrete in the in the footings, piers and wall, or the mortar in the in the masonry piers and walls has attained, on the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection. (a) Construction site - On or about February 2, 2017 employer began steel erection activities and Hillwood Construction Services L.P. had not provided required written notification of concrete cure percentage.